top of page
Writer's pictureCllr Paul Wray

A61 Lane Closure For 9 Weeks

As part of Connecting Leeds, roadworks at Stourton will require a lane 2 closure along the A61, starting from the Savannah Way traffic island. The closure will be in place from 6/10/20 for approximately 9 weeks,24/7.


The speed limit will drop to 30mph throughout the roadworks, and there will be signs at the Arla roundabout indicating a lane 2 closure and the roadworks.

The bus stop will remain operational.


The below drawing shows where works are to take place and also shows the signage to be displayed.

134 views0 comments

Recent Posts

See All

Comments


bottom of page