A61 Lane Closure For 9 Weeks

As part of Connecting Leeds, roadworks at Stourton will require a lane 2 closure along the A61, starting from the Savannah Way traffic island. The closure will be in place from 6/10/20 for approximately 9 weeks,24/7.


The speed limit will drop to 30mph throughout the roadworks, and there will be signs at the Arla roundabout indicating a lane 2 closure and the roadworks.

The bus stop will remain operational.


The below drawing shows where works are to take place and also shows the signage to be displayed.