top of page

Update: A61S Overnight Works

From the week starting 26/4/21, Connecting Leeds will be undertaking overnight resurfacing works at various locations along the A61s corridor. Further details of the traffic management arrangements that will be in place are given below, and diversion details are shown on the attached drawings.


Monday 26 April & Tuesday 27 April

  • 8pm to 6am: closure of Butterley Street at its junction with the A61 Hunslet Lane.


Monday 26 April

  • 12pm to 3am: works at the junction of Sayner Road and the A61 Hunslet Road with 3-way temporary lights at Leathley Road and the A61.

Monday 26 April

  • 8pm to 10pm: closure of the inbound A61 Hunslet Lane near Junction Street.

· 10pm to 2am: closure of the inbound right turn from A61 Hunslet Lane to Crown Point Road.

· 10pm to 2am: outbound lane 2 closure of A61 Hunlset Lane from Meadow Lane to Junction Street.

Tuesday 27 April

  • 8pm to 6am: closure of the inbound A61 Hunslet Lane from Leathley Road to Junction Street with a contraflow and diversion in place via Crown Point Road.

  • 8pm to 6am: closure of the right turn from Black Bull Street to A61 Hunslet Lane.

Wednesday 28 April

  • 8pm to 5am: closure of outbound A61 Great Wilson Street from Meadow Lane to Crown Point Road.

  • 8pm to 5am: closure of the outbound A61 Hunslet Road from South Accommodation Road to Pym Street.

  • 8pm to 5am: closure of the right turn from the Hunslet Distributor to Hunslet Road.


16 views0 comments
bottom of page